Material certificates prove the bar, plate, or sheet you ordered is the alloy and temper on the drawing. For many industrial buyers they are optional; for medical, aerospace, and regulated energy work they are mandatory. Asking too late is the most common reason lots miss ship dates.
Mill test report vs certificate of conformity
A mill test report (MTR) / material test certificate typically shows chemical composition and mechanical properties from the producing mill, tied to a heat or lot number. A certificate of conformity (CoC) from the machine shop states that purchased material matches the PO — useful, but weaker than a mill document when auditors want heat traceability.
What to write on the RFQ
- Exact alloy and temper (for example 6061-T6, 304 SS, POM-C)
- Certificate type required (mill MTR, EN 10204 3.1, CoC only)
- Whether RoHS / REACH statements are needed
- Any banned secondary processes (re-melt, unknown stock)
JS Model reserves certified stock when these notes appear on the quote. See how material verification fits the larger flow on Quality Assurance.
Traceability through machining
Once material is accepted, travelers keep the heat lot linked to your job. That link is what lets us ship a part with the matching cert instead of a generic “typical properties” sheet. If you split one PO across multiple alloys, label each line clearly so certs do not get mixed.
Plastics and castings
Engineering plastics may use manufacturer datasheets plus lot labels rather than steel-style MTRs. Vacuum-cast urethanes follow resin batch records. Tell us the end-use so we pick the right evidence package for CNC or vacuum casting.
Substitutions and dual-certified stock
Shops sometimes propose dual-certified or equivalent stock when the named mill product is long-lead. That can be fine if chemistry and mechanicals still meet the drawing — and if your quality team accepts the substitution in writing. Never assume “equivalent” without updating the PO and cert expectation.
If your program bans certain countries of melt or requires DFARS-style clauses, put that language in the RFQ. Material holds are easier to solve before CAM starts than after bars are already cut.
Send drawings with material and cert requirements and we will confirm availability before locking lead time.