Choosing between vacuum casting (urethane casting) and injection molding is usually a volume, schedule and material-fidelity decision — not a quality contest. Both can deliver excellent parts when used in the right window. The figures below are JS Model’s typical ranges; final numbers are confirmed for each RFQ.
Side-by-side comparison
| Criteria | Vacuum casting | Injection molding |
|---|---|---|
| Best volume | About 10–200 parts | About 1,000+ parts |
| Tooling | Silicone molds (low cost) | Aluminum or steel tool (high cost) |
| Tool life | About 15–25 shots per mold | Built for production volumes |
| Lead time to first parts | About 10–30 days | About 4–12 weeks |
| Materials | PU resins mimicking ABS, PC, PP, rubber | Production thermoplastics |
| Cosmetics | Near-molded look; paint and texture ready | Production finish at volume |
| Design changes | Inexpensive: remake the soft tool | Expensive tool revisions |
| Per-part cost | Fairly flat as quantity grows | Falls as volume pays off the tool |
How the costs behave
Vacuum casting spends little on tooling and more on each part. You pay for a master pattern and silicone molds, and because each mold gives about 15–25 parts, the mold cost repeats in steps as quantity grows. Every part is cast and cured individually, so the cost per part stays fairly flat.
Injection molding works the other way round. The aluminum or steel tool is a large upfront cost, but once it is running, each extra part costs little. The more parts the tool makes, the less tooling cost each part carries.
The crossover sits between these two curves. There is no single number, but many projects cross over somewhere between a few hundred and about 1,000 parts, once tooling is amortized and the true resin grade matters. If year-one volume is uncertain, quote both routes.
Lead time and schedule
A vacuum casting batch typically ships in about 10–30 days, including the master pattern and molds. An injection mold usually takes about 4–12 weeks before the first shots. For a quick geometry check, 3D printing (about 1–5 days) is faster than either; for production-like parts before hard tooling, use small-batch vacuum casting.
That gap is why the two processes are often combined. Many teams cast 20–100 urethane parts while aluminum or steel tools are cut. That bridge production keeps EVT builds, market tests and launch dates moving.
Material and cosmetic fidelity
Cast parts use polyurethane resins formulated to behave like ABS, PC, PP or rubber. They look and feel close to molded parts and take paint, texture, soft-touch coatings and pad printing or laser marking. They are still not the production thermoplastic. If a test depends on the exact grade, such as chemical, UV, flame or regulatory testing, the parts need to be molded in that grade; ask about prototype injection tooling when you need test samples in the real material.
The vacuum casting materials guide explains the resin families and what to specify for each.
When vacuum casting wins
- The geometry is still changing. Remaking a silicone mold costs little compared with revising a hard tool.
- You need cosmetic or functional lots for EVT or market tests. Cast parts look molded and can be painted to RAL or Pantone colors.
- Hard-tooling CAPEX is not justified yet. Year-one volume is uncertain or below a few hundred parts.
- You want elastomer or clear parts quickly. Rubber-like seals and grips, soft-touch overmolds and water-clear covers can be cast in about 10–30 days instead of waiting 4–12 weeks for dedicated tools.
When injection molding wins
- The design is frozen and volume will climb. The tool cost is spread over thousands of parts.
- You need the exact resin grade. Chemical, UV, flame and regulatory tests need the production material.
- Per-part cost has to fall. When the unit cost must go below what silicone molds can reach, a hard tool is the way to get there.
A worked example
Suppose a team needs 60 housings for an EVT build in five weeks and expects about 2,000 units in year one. This is an illustration based on the typical ranges above, not a quote.
- At about 15–25 parts per mold, 60 housings need three or four silicone molds, cast in parallel. The batch can ship in about 10–30 days.
- An injection tool takes about 4–12 weeks, so on its own it would most likely miss the EVT date.
- About 2,000 units a year is well above the usual crossover, so production belongs in an injection mold.
The practical plan is to cast the EVT parts now, cut the tool in parallel, and switch to molded parts for production.
Questions to answer before you choose
- How many parts do you need now, and how many in the first year?
- Is the design frozen, or will it change after this build?
- Does any test need the exact production plastic?
- What cosmetic standard do the parts need: paint, texture, clarity or soft-touch?
- When do the first parts have to arrive?
If the answers point both ways, ask for both routes in the same RFQ.
RFQ tip for procurement
State target volume for year one, not only the first PO. That helps JS Model recommend casting now, parallel molds for speed, or a direct path to molding. Send drawings with quantity and ship-to country (EU / US / CA / IL); quotes come back with pricing, a mold plan and DFM notes, typically within one business day.
Also read what vacuum casting is and CNC machining vs vacuum casting for plastic prototypes.