Prototype approval should be based on the part requirements, not just whether a sample looks good in a photograph. Record the tests and measurements that show the prototype performs its intended function.
Confirm identity and fit
Match the sample to the released drawing revision, material, and finish. Assemble it with the intended mating components and note interference, alignment, torque, or movement issues that a simple dimensional report may not reveal.
Inspect what matters
Measure critical bores, mating faces, threads, and feature relationships against the drawing. Evaluate cosmetic zones under agreed conditions. Keep any rework or hand-fitting record so the next build is not based on an undocumented adjustment.
Document the production decision
Record approved deviations, remaining risks, and changes required before a repeat order. If the sample is accepted conditionally, release a revised drawing or explicit acceptance note. For a larger run, define whether a first-piece inspection is needed.
Related guide: prototype-to-production handoff.
Match each prototype to a decision
| Test purpose | Evidence to record |
|---|---|
| Fit and assembly | Mating parts, datum references and acceptable clearance. |
| Load or motion | Fixture, loading, duration and the failure criterion. |
| Environment | Temperature, humidity, cleaners or other exposure. |
| Appearance | Finish reference, viewing conditions and accepted sample. |
A prototype made by a different route may answer some questions but not all. Document differences in material, finish, geometry or process so the result is not generalized beyond what was tested.
Prototype validation questions
Does a successful assembly prove fatigue life?
No. Assembly confirms a particular fit under the test conditions. Repeated loading, wear and environmental performance need their own appropriate validation.
What if the prototype is modified during testing?
Record the modification and decide whether a controlled drawing update or new specimen is required. Do not approve production using an unrecorded hand-adjusted sample.
Close the validation loop
Record measured results, photographs where helpful, failures, open questions and the release decision. Transfer those conclusions through the production handoff rather than a simple “sample approved” message.