First article inspection checks an initial production part against the released engineering definition before the same route is repeated. It is a verification method, not a substitute for a complete drawing or a promise that every later part is identical.

Define scope before machining

Identify the part number and revision, material, finish condition, required dimensions, geometric tolerances, and visual criteria. State whether the first article is checked before or after coating. Make the sample quantity and documentation expectation explicit.

Match results to requirements

Record measured values against drawing characteristics and identify the measuring method where relevant. Keep any nonconformance and disposition separate from accepted results. NIST discusses how manufacturing data can retain links between inspection results and the design definition.

Use the report for the next decision

Review the first piece before approving a repeat batch. A pass on one sample does not define a sampling plan for all subsequent parts. Specify production inspection frequency and any process changes that require a new first-article review.

Related guide: dimensional inspection reports.

Agree what the first article must establish

First article review links the initial manufactured item to the released requirements. The scope can include dimensions, material records, finish, marking and assembly checks where specified. It is not automatically a certification scheme or proof of ongoing process capability. Agree the scope, sample identity and approval conditions before the production lot is released.

First article package checklist

  • Part number, released revision and inspected sample identification.
  • Referenced dimensions with nominal values, limits and results.
  • Material and finish evidence required by the purchase specification.
  • Recorded deviations or unverified requirements.
  • Approval decision and conditions for proceeding with production.

First article questions

Does an accepted first article approve later drawing changes?

No. Review the impact of changes to geometry, material, finish or process and decide what must be re-inspected.

Does first article mean every production part is measured?

No. Production sampling or individual inspection is a separate agreement. State which features need full inspection and how lot results are recorded.

Before releasing the remaining quantity

Close open discrepancies and connect the approved sample to the current revision. Read the report interpretation guide when reviewing measured results and acceptance limits.