Begin with a technical review, not a price guessed from an incomplete model. JS-MODEL needs enough information to confirm feasibility, manufacturing scope, and what will be inspected.
Send a usable RFQ
Provide a STEP model, a 2D drawing for functional tolerances and threads, material grade, finish, quantity, and delivery destination. If a specification has an approved alternative, mark it clearly. See the CNC design guide for geometry checks.
Review the quotation
Check part revision, quantity, process, finish, inspection documents, lead time, shipping, and payment terms in the written quotation. Ask about any discrepancy before approving production. Changes after approval may need a revised quote.
Contact the team
Use the JS-MODEL contact page to start. If CAD files cannot be attached there, mention the project and the team can advise how to share them securely. Do not send confidential drawings to an unverified address.
Make the request ready for a technical review
A useful RFQ explains the finished component rather than merely attaching geometry. State the material grade, quantity, desired finish and the function of critical features. Identify whether the request is for a visual prototype, an assembled test part or production hardware. This helps prevent a quote based on assumptions that differ from the buyer’s acceptance requirements.
Before confirming an order
- Confirm the part number and matching model/drawing revision.
- Resolve proposed substitutions, DFM changes and open questions.
- Check what inspection, documentation and finishing are included.
- Agree the quantity and any sample approval stage.
- Confirm commercial and delivery terms directly for the actual order.
Ordering questions
Does submitting an inquiry authorize production?
No. Treat the inquiry as a request for review. Production should follow the agreed quotation and approval process, with the controlling files clearly identified.
Can a later file replace the quoted revision automatically?
Do not assume so. Send a change summary and obtain confirmation of technical and commercial effects. Use the revision-control checklist.
Keep the release record
Retain the confirmed specification, approvals and quote reference together. This article is preparation guidance, not a substitute for the terms agreed for an individual order.